Infrastructure and News
La Aurora is being renovated, along with other airports in Guatemala, such as Mundo Maya International Airport, Quetzaltenango Airport, Puerto Barrios Airport, and San José Airport.
In July 2007, seven new gates were opened. These gates are equipped with jetway bridges and modern conveniences, also a new parking garage was also built and it can handle up to 500 vehicles.
There are brand new ticket counters. 2007 brought significant gate expansion (11 new gates were available starting December 2007). The airport now has two concourses. The northern concourse has 12 traditional gates and 3 remote gates. The central concourse, is used for larger aircraft as it provides 4-6 gates depending on the size of the aircraft.
The airport's runway currently measures 2,987 m × 60 m (9,800 ft × 197 ft). There have been efforts in the past to expand the runway but this has not yet been possible since there's a commercial area to the north of the runway and a small ravine near the southern side of the runway. Still, the renovation of the runway is in progress. The first phase consists in repaving the runway as well modernizing the illumination system. Future plans to expand the taxiway repave and move all the cargo facilities to San José Airport in Escuintla and Puerto Barrios Airport in Izabal. This will make room for more passenger terminal area and improved taxiways. Finally, the airport administration building is being refurbished and a regional terminal is being built.
La Aurora International Airport has 2 Exclusive VIP Lounges. Los Añejos Business Lounge serving Iberia's first class passengers and Copa Club, a VIP Lounge for passengers travelling on Copa Airlines and United Airlines
Cargo operations are handled beside the passenger terminal building by COMBEX-IM or in the DHL hangars.
The head office of the Dirección General de Aeronáutica Civil is located in the airport Zone 13.
Read more about this topic: La Aurora International Airport
Famous quotes containing the word news:
“The greatest felony in the news business today is to be behind, or to miss a big story. So speed and quantity substitute for thoroughness and quality, for accuracy and context. The pressure to compete, the fear somebody else will make the splash first, creates a frenzied environment in which a blizzard of information is presented and serious questions may not be raised.”
—Carl Bernstein (b. 1944)