Kings Norton Railway Station - Today

Today

With the development of both bus and tram services, the need for such a large facility reduced from the 1930s onwards. The result is that today although all four platforms all remain in place, only the outer two remain in passenger use, with the middle island platform now derelict.

Refurbished as part of the Cross-City line in 1978, it retained some of its original features following refurbishment, unlike the other 'cross city line' stations. The original station building survived, leased out for commercial purposes, until it was demolished in February 2006 for safety reasons. An extension car park provides a Park and Ride facility.

Kings Norton is served by London Midland services, using Class 323 electric multiple units. London Midland operate the Cross-City line on behalf of Centro.

Kings Norton Station is equipped with real-time information departure boards which were installed in 2006 by Central Trains.

Read more about this topic:  Kings Norton Railway Station

Famous quotes containing the word today:

    “Most personal correspondence of today consists of letters the first half of which are given over to an indexed statement of why the writer hasn’t written before, followed by one paragraph of small talk, with the remainder devoted to reasons why it is imperative that the letter be brought to a close.”
    —Robert Benchley (1889–1945)

    “I think with the Romans, that the general of today should be a soldier tomorrow if necessary.”
    —Thomas Jefferson (1743–1826)

    “It is not their brotherly love but the impotence of their brotherly love that keeps the Christians of today from—burning us.”
    —Friedrich Nietzsche (1844–1900)