King Fahd International Airport - Design and Construction

Design and Construction

Design started in 1976. The site master plan was created by architecture firm Yamasaki & Associates and Boeing Aerosystems International, and completed in 1977. Construction began in 1983, and the airport opened for commercial operations in November 1999.

Read more about this topic:  King Fahd International Airport

Famous quotes containing the words design and/or construction:

    I always consider the settlement of America with reverence and wonder, as the opening of a grand scene and design in providence, for the illumination of the ignorant and the emancipation of the slavish part of mankind all over the earth.
    John Adams (1735–1826)

    When the leaders choose to make themselves bidders at an auction of popularity, their talents, in the construction of the state, will be of no service. They will become flatterers instead of legislators; the instruments, not the guides, of the people.
    Edmund Burke (1729–1797)