King Fahd Causeway - Construction Details

Construction Details

The project cost a total of US$800 million (SAR3 billion). One of the major contractors of the project was Ballast Nedam, based in the Netherlands.It is unclear how many workers were engaged in the construction of the Causeway. The four-lane road is 25 km (16 mi) long and approximately 23 m (75 ft) wide, and was built using 350,000 m3 (12,000,000 cu ft) of concrete along with 47,000 metric tonnes of reinforced steel. The causeway was constructed in three segments starting from Saudi Arabia:

  1. From Al-Aziziyyah, south of Khobar, to the Border Station
  2. From the Border Station to Nasan Island in Bahrain
  3. From Nasan island to the Al-Jasra, west of Manama, on the main island of Bahrain

Read more about this topic:  King Fahd Causeway

Famous quotes containing the words construction and/or details:

    No construction stiff working overtime takes more stress and straining than we did just to stay high.
    Gus Van Sant, U.S. screenwriter and director, and Dan Yost. Bob Hughes (Matt Dillon)

    Anyone can see that to write Uncle Tom’s Cabin on the knee in the kitchen, with constant calls to cooking and other details of housework to punctuate the paragraphs, was a more difficult achievement than to write it at leisure in a quiet room.
    Anna Garlin Spencer (1851–1931)