King Fahd Causeway - Construction Details

Construction Details

The project cost a total of US$800 million (SAR3 billion). One of the major contractors of the project was Ballast Nedam, based in the Netherlands.It is unclear how many workers were engaged in the construction of the Causeway. The four-lane road is 25 km (16 mi) long and approximately 23 m (75 ft) wide, and was built using 350,000 m3 (12,000,000 cu ft) of concrete along with 47,000 metric tonnes of reinforced steel. The causeway was constructed in three segments starting from Saudi Arabia:

  1. From Al-Aziziyyah, south of Khobar, to the Border Station
  2. From the Border Station to Nasan Island in Bahrain
  3. From Nasan island to the Al-Jasra, west of Manama, on the main island of Bahrain

Read more about this topic:  King Fahd Causeway

Famous quotes containing the words construction and/or details:

    There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.
    John Dewey (1859–1952)

    Different persons growing up in the same language are like different bushes trimmed and trained to take the shape of identical elephants. The anatomical details of twigs and branches will fulfill the elephantine form differently from bush to bush, but the overall outward results are alike.
    Willard Van Orman Quine (b. 1908)