Operations
KPR transports over 16,000 carloads per year. Most of the goods transported by KPR are wood products; although grain, cement, scrap metal and industrial products can be seen. Currently KPR runs trains 5 days per week and their schedule is as follows:
- Kelowna: Monday and Wednesday (Trains stay overnight and return to Vernon on Tuesday and Thursday)
- Lumby: Tuesday and Friday
- Kamloops: Can run any day of the week as needed
Read more about this topic: Kelowna Pacific Railway
Famous quotes containing the word operations:
“You cant have operations without screams. Pain and the knifetheyre inseparable.”
—Jean Scott Rogers. Robert Day. Mr. Blount (Frank Pettingell)
“Plot, rules, nor even poetry, are not half so great beauties in tragedy or comedy as a just imitation of nature, of character, of the passions and their operations in diversified situations.”
—Horace Walpole (17171797)
“A sociosphere of contact, control, persuasion and dissuasion, of exhibitions of inhibitions in massive or homeopathic doses...: this is obscenity. All structures turned inside out and exhibited, all operations rendered visible. In America this goes all the way from the bewildering network of aerial telephone and electric wires ... to the concrete multiplication of all the bodily functions in the home, the litany of ingredients on the tiniest can of food, the exhibition of income or IQ.”
—Jean Baudrillard (b. 1929)