Joplin High School - Campus and Facilities

Campus and Facilities

Since August 2011 the school has been located in a renovated department store. The design of this temporary facility was awarded the Council of Educational Facilities Planners International's 2012 James D. MacConnell Award for excellence in school design.

Franklin Tech has been relocated to temporary facilities in multiple locations in Joplin.

On May 22, 2012, the groundbreaking ceremony was held marking the start of construction of the new permanent replacement school. Construction costs for the new 400,000-square-foot high facility, which includes a 70,000-square-foot vocational technical center, are expected to be $92.2 million. The school is planned to open in 2014.

Read more about this topic:  Joplin High School

Famous quotes containing the word facilities:

    I have always found that when men have exhausted their own resources, they fall back on “the intentions of the Creator.” But their platitudes have ceased to have any influence with those women who believe they have the same facilities for communication with the Divine mind as men have.
    Elizabeth Cady Stanton (1815–1902)