Replacement Bridge Without Tolls: 1975-1982
A new four-lane lift bridge was completed in stages from 1975 to 1982 at a cost of $75 million. The replacement was funded with road user taxes rather than toll revenue bonds. When the new bridge was completed, a short section of the old bridge on the Newport News side was retained for use as a fishing pier.
Read more about this topic: James River Bridge
Famous quotes containing the words replacement and/or bridge:
“Not even the visionary or mystical experience ever lasts very long. It is for art to capture that experience, to offer it to, in the case of literature, its readers; to be, for a secular, materialist culture, some sort of replacement for what the love of god offers in the world of faith.”
—Salman Rushdie (b. 1947)
“A circle swoop, and a quick parabola under the bridge arches
Where light pushes through;
A sudden turning upon itself of a thing in the air.
A dip to the water.”
—D.H. (David Herbert)