Cost and Time Estimates
The Reference Design Report estimates the cost of building the ILC, excluding R&D, prototyping, land acquisition, underground easement costs, detectors, contingencies, and inflation, at US$6.75 billion (in 2007 prices). From formal project approval, completion of the accelerator complex and detectors is expected to require seven years. The host country would be required to pay $1.8 billion for site-specific costs like digging tunnels and shafts and supplying water and electricity.
U.S. Secretary of Energy Steven Chu estimates the total cost to be US$25 billion. ILC Director Barish says this is likely to be an overestimate. Other Department of Energy officials have estimated a $20 billion total.
Read more about this topic: International Linear Collider
Famous quotes containing the words cost, time and/or estimates:
“The one regret I have about my own abortions is that they cost money that might otherwise have been spent on something more pleasurable, like taking the kids to movies and theme parks.”
—Barbara Ehrenreich (b. 1941)
“When I saw it I was so glad I could not speak. My eyes seemed too little to see it all.... I was a long time without speaking to my friend. To see me always looking and never speaking he thought I had lost my mind. I could not understand where all this could come from.”
—For the State of Maine, U.S. public relief program (1935-1943)
“And, by the way, who estimates the value of the crop which nature yields in the still wilder fields unimproved by man? The crop of English hay is carefully weighed, the moisture calculated, the silicates and the potash; but in all dells and pond-holes in the woods and pastures and swamps grows a rich and various crop only unreaped by man.”
—Henry David Thoreau (18171862)