Integrated Logistics Support - Maintenance Planning

Maintenance Planning

Maintenance planning begins early in the acquisition process with development of the maintenance concept. It is conducted to evolve and establish requirements and tasks to be accomplished for achieving, restoring, and maintaining the operational capability for the life of the system. Maintenance planning relies on Level Of Repair Analysis (LORA) as a function of the system acquisition process. Maintenance planning will:

  • Define the actions and support necessary to ensure that the system attains the specified system readiness objectives with minimum Life Cycle Cost (LCC).
  • Set up specific criteria for repair, including Built-In Test Equipment (BITE) requirements, testability, reliability, and maintainability; support equipment requirements; automatic test equipment; and manpower skills and facility requirements.
  • State specific maintenance tasks, to be performed on the system.
  • Define actions and support required for fielding and marketing the system.
  • Address warranty considerations.
  • The maintenance concept must ensure prudent use of manpower and resources. When formulating the maintenance concept, analysis of the proposed work environment on the health and safety of maintenance personnel must be considered.
  • Conduct a LORA repair analysis to optimize the support system, in terms of LCC, readiness objectives, design for discard, maintenance task distribution, support equipment and ATE, and manpower and personnel requirements.
  • Minimize the use of hazardous materials and the generation of waste.

Read more about this topic:  Integrated Logistics Support

Famous quotes containing the words maintenance and/or planning:

    It is an injustice that an old, broken, half-dead father should enjoy alone, in a corner of his hearth, possessions that would suffice for the advancement and maintenance of many children.
    Michel de Montaigne (1533–1592)

    Play for young children is not recreation activity,... It is not leisure-time activity nor escape activity.... Play is thinking time for young children. It is language time. Problem-solving time. It is memory time, planning time, investigating time. It is organization-of-ideas time, when the young child uses his mind and body and his social skills and all his powers in response to the stimuli he has met.
    James L. Hymes, Jr. (20th century)