Routine Maintenance
As with any piece of instrumentation or equipment, there are many aspects of maintenance that need to be encompassed by daily, weekly and annual procedures. The frequency of maintenance is typically determined by the sample volume and cumulative run time that the instrument is subjected to.
One of the first things that should be carried out before the calibration of the ICP-MS is a sensitivity check and optimization. This ensures that the operator is aware of any possible issues with the instrument and if so, may address them before beginning a calibration. Typical indicators of sensitivity are Rhodium levels, Cerium/Oxide ratios and DI water blanks.
One of the most frequent forms of routine maintenance is replacing sample and waste tubing on the peristaltic pump, as these tubes can get worn fairly quickly resulting in holes and clogs in the sample line, resulting in skewed results. Other parts that will need regular cleaning and/or replacing are sample tips, nebulizer tips, sample cones, skimmer cones, injector tubes, torches and lenses. It may also be necessary to change the oil in the interface roughing pump as well as the vacuum backing pump, depending on the workload put on the instrument.
Read more about this topic: Inductively Coupled Plasma Mass Spectrometry
Famous quotes containing the words routine and/or maintenance:
“Some days your hats off to the full-time mothers for being able to endure the relentless routine and incessant policing seven days a week instead of two. But on other days, merely the image of this woman crafting a brontosaurus out of sugar paste and sheet cake for her two-year-olds birthday drives a stake through your heart.”
—Melinda M. Marshall (20th century)
“War is in truth a disease in which the juices that serve health and maintenance are used for the sole purpose of nourishing something foreign, something at odds with nature.”
—Johann Wolfgang Von Goethe (17491832)