Test Facilities
There is no single test standard or facility capable of qualifying the protection of an entire building. The Cyclone Testing Station in Australia can test building systems (e.g., roofs, exterior cladding), and indirectly test entire small buildings with structural loading to simulate wind pressures. In the United States, the test facilities at the FM Global Research Campus includes both direct wind testing of roof components to speeds up to 160 mph (260 km/h), and roof uplift simulation using suction tables per industry standards.
Read more about this topic: Hurricane Preparedness
Famous quotes containing the words test and/or facilities:
“No drug, not even alcohol, causes the fundamental ills of society. If were looking for the sources of our troubles, we shouldnt test people for drugs, we should test them for stupidity, ignorance, greed and love of power.”
—P.J. (Patrick Jake)
“Marriage is good enough for the lower classes: they have facilities for desertion that are denied to us.”
—George Bernard Shaw (18561950)