Construction and Acquisition
The ship was constructed by the Australian shipbuilder Incat in Hobart, Tasmania, and was leased to the U.S. Navy through Bollinger/Incat of Lockport, Louisiana. She was the second catamaran the Navy leased to test new technologies and concepts associated with the Chief of Naval Operations's "Seapower 21" plan. The contract value for the first year was $21.7 million.
Swift is the fourth Incat-built high-speed wave piercing catamaran to enter military service, following behind HMAS Jervis Bay, U.S. Army Vessel (USAV) Theater Support Vessel Spearhead (TSV-X1) and HSV-X1 Joint Venture.
Read more about this topic: HSV-2 Swift
Famous quotes containing the words construction and/or acquisition:
“There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.”
—John Dewey (18591952)
“Whatever may be our just grievances in the southern states, it is fitting that we acknowledge that, considering their poverty and past relationship to the Negro race, they have done remarkably well for the cause of education among us. That the whole South should commit itself to the principle that the colored people have a right to be educated is an immense acquisition to the cause of popular education.”
—Fannie Barrier Williams (18551944)