Route
The service runs along the Great Western Main Line from Paddington to Airport Junction (Network Rail owned infrastructure). The line from Airport Junction to the airport terminals is owned by Heathrow Airport Holdings Limited but maintained on their behalf by Network Rail. The line is electrified at 25 kV AC overhead and uses Automatic Train Protection (ATP). The controlling signalbox for the entire route is Slough (New) IECC.
Read more about this topic: Heathrow Express
Famous quotes containing the word route:
“no arranged terror: no forcing of image, plan,
or thought:
no propaganda, no humbling of reality to precept:
terror pervades but is not arranged, all possibilities
of escape open: no route shut,”
—Archie Randolph Ammons (b. 1926)
“The route through childhood is shaped by many forces, and it differs for each of us. Our biological inheritance, the temperament with which we are born, the care we receive, our family relationships, the place where we grow up, the schools we attend, the culture in which we participate, and the historical period in which we liveall these affect the paths we take through childhood and condition the remainder of our lives.”
—Robert H. Wozniak (20th century)
“But however the forms of family life have changed and the number expanded, the role of the family has remained constant and it continues to be the major institution through which children pass en route to adulthood.”
—Bernice Weissbourd (20th century)