Havant Railway Station - History

History

The first station at Havant was built by the London, Brighton and South Coast Railway (LBSCR) 500 m to the east - a small wayside station (called Havant Halt). It was demolished after a serious fire. A newer station was then built 200 m west to serve the then new London and South Western Railway (LSWR) Portsmouth Direct Line. This station was demolished so that a bigger station could be built 300 m further west to serve the new Hayling Island branch line. It had three platforms, one for Hayling Island and two for the stopping main line services.

Prior to grouping, the "Battle of Havant" took place between the LB&SCR and the L&SWR when the two railway companies fought for the right to use LB&SCR tracks into Havant in order for the L&SWR to reach Portsmouth. (See Havant New). Although a rarity in the UK, these disputes were quite common in the United States where they were known as frog wars.

Havant was the terminus for the Hayling Island branch services until late in 1963. Apart from the platform there was a run round loop, a siding serving a warehouse and a water column supplied by a circular metal water tank located near the signal box. In the Spring of 1966 the Hayling Island tracks were removed. The space they occupied was later replaced with a car park and a fence on the south side of the platform.

As part of the Waterloo to Portsmouth electrification the station was completely rebuilt in 1938. The number of tracks was increased from two to four, two for stopping trains and the two for non-stop, generally express trains. The northernmost of the two fast tracks (as mentioned above) was later removed, and the remaining fast (through) track was also removed in late 2006. Judging by the new track layout east of the station, this arrangement seems to be permanent.

After the engineering work of 2007 was finally finalized after a lengthy delay that had lasted from the beginning of the year, the stations two platforms have become bi-directional platforms. This means that both platforms can be used for trains going in either direction. Such as when the fast Waterloo service, the xx34 is running late behind the slow Waterloo service xx40. This means that the Slower service may be placed on Platform 1, which services to London go on, and wait, while the faster service is brought onto Platform 2, and then over take the service, so that it can make up the time lost, and not lose more time while waiting to overtake the slower service up in Haslemere station.

Read more about this topic:  Havant Railway Station

Famous quotes containing the word history:

    America is, therefore the land of the future, where, in the ages that lie before us, the burden of the World’s history shall reveal itself. It is a land of desire for all those who are weary of the historical lumber-room of Old Europe.
    Georg Wilhelm Friedrich Hegel (1770–1831)

    Postmodernism is, almost by definition, a transitional cusp of social, cultural, economic and ideological history when modernism’s high-minded principles and preoccupations have ceased to function, but before they have been replaced with a totally new system of values. It represents a moment of suspension before the batteries are recharged for the new millennium, an acknowledgment that preceding the future is a strange and hybrid interregnum that might be called the last gasp of the past.
    Gilbert Adair, British author, critic. Sunday Times: Books (London, April 21, 1991)

    To summarize the contentions of this paper then. Firstly, the phrase ‘the meaning of a word’ is a spurious phrase. Secondly and consequently, a re-examination is needed of phrases like the two which I discuss, ‘being a part of the meaning of’ and ‘having the same meaning.’ On these matters, dogmatists require prodding: although history indeed suggests that it may sometimes be better to let sleeping dogmatists lie.
    —J.L. (John Langshaw)