Hartland Landfill - History

History

The Hartland landfill started as a private dump site in the 1950s. The Hartland landfill was bought by the Capital Regional District in 1975. As it began to fill up, construction began on phase two in 1997. This involved blasting out the side of a rock face and covering phase one with dirt and vegetation. This procedure is still taking place. In 2003 the Hartland landfill installed an electricity generating station, to create electricity from the methane gas that was being collected from the decomposing refuse. This generating station now creates 1.6 megawatts of electricity, enough to power about 1,600 homes. After analysis of its garbage composition, the landfill found that 30 percent of its garbage was organic in nature. This has resulted in calls for local food waste collection and composting, which is currently done in some of the region's municipalities either as a regular service or as a pilot project.

Read more about this topic:  Hartland Landfill

Famous quotes containing the word history:

    Anyone who is practically acquainted with scientific work is aware that those who refuse to go beyond fact rarely get as far as fact; and anyone who has studied the history of science knows that almost every great step therein has been made by the “anticipation of Nature.”
    Thomas Henry Huxley (1825–95)

    No matter how vital experience might be while you lived it, no sooner was it ended and dead than it became as lifeless as the piles of dry dust in a school history book.
    Ellen Glasgow (1874–1945)

    Perhaps universal history is the history of the diverse intonation of some metaphors.
    Jorge Luis Borges (1899–1986)