GSI Helmholtz Centre For Heavy Ion Research - Primary Research

Primary Research

The chief tool is the heavy ion accelerator facility consisting of UNILAC, the Universal Linear Accelerator (energy of 2 - 11.4 MeV per nucleon), SIS 18, the heavy-ion synchrotron (1 - 2 GeV/u) and ESR, the experimental storage ring (0.5 - 1 GeV/u) and FRS. The UNILAC was commissioned in 1975, the SIS 18 and the ESR were added in 1990 boosting the ion acceleration from 10% of light speed to 90%.

Elements discovered at GSI: meitnerium (1982), hassium (1984), darmstadtium (1994), roentgenium (1994), bohrium (1996), and copernicium (1996).

Read more about this topic:  GSI Helmholtz Centre For Heavy Ion Research

Famous quotes containing the words primary and/or research:

    But the doctrine of the Farm is merely this, that every man ought to stand in primary relations to the work of the world, ought to do it himself, and not to suffer the accident of his having a purse in his pocket, or his having been bred to some dishonorable and injurious craft, to sever him from those duties.
    Ralph Waldo Emerson (1803–1882)

    After all, the ultimate goal of all research is not objectivity, but truth.
    Helene Deutsch (1884–1982)