Signage and Designation
The name of the road and its signage change along its route:
- Fort Bend Toll Road - from US 90 Alt to Beltway 8 / Sam Houston Parkway
- Fort Bend Parkway Toll Road - from Beltway 8 / Sam Houston Parkway to SH 6
- SH 122 or SH 122 Toll (proposed) - from SH 6 to SH 99 (Grand Parkway) proposed south extension east of US 59
Although the Fort Bend Toll Road (Harris County) and the Fort Bend Parkway Toll Road (Fort Bend County) connect as one contiguous route, each is signed as a separate route. State Highway 122 does not actually exist except on paper right now, remaining as the placeholder for TxDOT in case it were to decide to use state funding to build the final southern portion.
Read more about this topic: Fort Bend Parkway
Famous quotes containing the word designation:
“In a period of a peoples life that bears the designation transitional, the task of a thinking individual, of a sincere citizen of his country, is to go forward, despite the dirt and difficulty of the path, to go forward without losing from view even for a moment those fundamental ideals on which the entire existence of the society to which he belongs is built.”
—Ivan Sergeevich Turgenev (18181883)