Construction
In an eclectic, revived Flemish renaissance style, (Renaissance Revival architecture), the station is constructed from dark basalt from Kokonga in the Strath-Taieri with lighter Oamaru stone facings, giving it the distinctive light and dark pattern common to many of the grander buildings of Dunedin and Christchurch. Pink granite was used for a series of supporting pillars which line a colonnade at the front of the building. The roof was tiled in terracotta shingles from Marseilles surmounted by copper-domed cupolas. The southern end of the building is dominated by the 37-metre clocktower which is visible from much of central Dunedin.
The booking hall features a mosaic floor of almost 750,000 Minton tiles. A frieze of Royal Doulton porcelain runs around the balcony above it from which the floor's design (featuring a locomotive and related symbols) can be clearly seen. The station's main platform is the country's longest, extending for about 500 metres.
The building's foundation stone was laid by the Minister of Railways Joseph Ward on June 3, 1904. The Prime Minister Richard Seddon was also present. The station was opened by Ward, by then Prime Minister, in 1906. The construction of the building was kept within budget, and cost £40,000.
Read more about this topic: Dunedin Railway Station
Famous quotes containing the word construction:
“No construction stiff working overtime takes more stress and straining than we did just to stay high.”
—Gus Van Sant, U.S. screenwriter and director, and Dan Yost. Bob Hughes (Matt Dillon)
“Striving toward a goal puts a more pleasing construction on our advance toward death.”
—Mason Cooley (b. 1927)
“When the leaders choose to make themselves bidders at an auction of popularity, their talents, in the construction of the state, will be of no service. They will become flatterers instead of legislators; the instruments, not the guides, of the people.”
—Edmund Burke (17291797)