Operation
The operational base is at Paignton, where an engine shed is part of the station buildings. Heavy overhauls are undertaken at Churston where there is a locomotive workshop on the west side of the line, and a carriage shop and turntable on the east side.
Signalling is by electric multiple-aspect signals controlled from a panel at Britannia Crossing. The level crossing at that site is supervised by the signalman at the panel, but that at Sands Road, just outside Paignton station, is operated locally by the train crew.
All stations have booking offices but those at Goodrington Sands and Churston are only open at busy times and tickets are issued on the train most of the time.
The steam railway also operates a small fleet of buses, many of which are open-top, on routes in connection with the railway and ferry.
Read more about this topic: Dartmouth Steam Railway
Famous quotes containing the word operation:
“It is critical vision alone which can mitigate the unimpeded operation of the automatic.”
—Marshall McLuhan (19111980)
“You may read any quantity of books, and you may almost as ignorant as you were at starting, if you dont have, at the back of your minds, the change for words in definite images which can only be acquired through the operation of your observing faculties on the phenomena of nature.”
—Thomas Henry Huxley (182595)
“Waiting for the race to become official, he began to feel as if he had as much effect on the final outcome of the operation as a single piece of a jumbo jigsaw puzzle has to its predetermined final design. Only the addition of the missing fragments of the puzzle would reveal if the picture was as he guessed it would be.”
—Stanley Kubrick (b. 1928)