Computer-aided Lean Management - History

History

CALM was inspired by lean processes and techniques that were already dominant management technologies with a wide diversity of applications and successes. Motorola and General Electric (GE) had been known for the concepts of Six Sigma; Boeing had been managing mass (using modular and flexible assembly options), and Toyota put it all together into a truly lean business through its Toyota Production System. Boeing in turn took the Toyota model and added computer-aided enforcement of lean methodologies throughout the manufacturing process.

One of the major sources for CALM's outgrowth was integrated definition (IDEF) modeling in aerospace manufacturing that was pioneered by the U.S. Air Force in the 1970s. IDEF is a methodology designed to model the end-to-end decisions, actions, and activities of an organization or system so that costs, performance, and cycle times can be optimized. IDEF methods have been adapted for wider use in automotive, aerospace, pharmaceuticals, and even software development industries. IDEF methods serve as a starting point to understand lean management through semantic data modeling. The IDEF process begins by mapping the as-is functions of an enterprise, creating a graphical model, or road map, that shows what controls each important function, who performs it, what resources are required for carrying it out, what it produces, how much it costs, and what relationships it has to other functions of the organization. IDEF simulations of the to-be enterprise have been found to be efficient at streamlining and modernizing both companies and governmental agencies.

Perhaps the best-developed evolution of the IDEF model beyond Toyota was at Boeing. Their project life-cycle process has grown into a rigorous software system that links people, tasks, tools, materials, and the environmental impact of any newly planned project, before any building is allowed to begin. Routinely, more than half of the time for any given project is spent building the precedence diagrams, or three-dimensional process maps, integrating with outside suppliers, and designing the implementation plan-all on the computer. Once real activity is initiated, an action tracker is used to monitor inputs and outputs versus the schedule and delivery metrics in real time throughout the organization. When the execution of a new airplane design begins, it is so well organized that it consistently cuts both costs and build time in half for each successive generation of airframe. And, of course, it is paperless. Boeing created a complex lean management process called 'define and control airplane configuration/manufacturing resource management' (DCAC/MRM). The process was built with the help of the operations research and computer sciences departments of the University of Pittsburgh. The manufacture of the Boeing 777 was ultimately a success, and it became the precursor to succeeding generations of CALM at Boeing. Boeing is four generations beyond that airplane now, and they have succeeded in cutting the time and cost for each new generation of airplane. Boeing’s successes in conversion from inefficient silos of manufacturing to a lean and efficient operation have become legendary.

The methodology of CALM has recently been applied to field orientated infrastructure based businesses with highly interdependent systems, such as electric utilities where a smart grid concept is being researched and developed. The management of infrastructure-based industries like oil, gas, electricity, water, transportation, and renewables requires massive investments in interdependent, physical infrastructure, as well as simultaneous attention to disparate market forces. In infrastructure businesses that manage field assets, uncertainty is the prime impediment to profitability, rather than the maintenance of efficient supply chains or the management of factory assembly lines. These businesses are dominated by risk from uncertainties such as weather, market variations, transportation disruptions, government actions, logistic difficulties, geology, and asset reliability. CALM has been applied to deal with these types of infrastructure based challenges.

Read more about this topic:  Computer-aided Lean Management

Famous quotes containing the word history:

    The view of Jerusalem is the history of the world; it is more, it is the history of earth and of heaven.
    Benjamin Disraeli (1804–1881)

    When the history of guilt is written, parents who refuse their children money will be right up there in the Top Ten.
    Erma Brombeck (20th century)

    This is the greatest week in the history of the world since the Creation, because as a result of what happened in this week, the world is bigger, infinitely.
    Richard M. Nixon (1913–1995)