Hydroelectricity was not the primary goal of the project, but during World War II the demand for electricity in the region boomed. The Hanford nuclear reservation was built just south of the project and aluminum smelting plants flocked to the Columbia Basin. A new power house was built at the Grand Coulee Dam, starting in the late sixties, that tripled the generating capacity. Part of the dam had to be blown up and re-built to make way for the new generators. Electricity is now transmitted to Canada and as far south as San Diego.

There are a number of issues regarding the runoff of irrigation water. The project region receives about 6 to 10 inches (250 mm) of annual rainfall, while the application of irrigation water amounts to an equivalent 40 to 50 inches (1,300 mm). The original plans did not sufficiently address the inevitable seepage and runoff. In some cases the results are beneficial. For example, numerous new lakes provide recreation opportunities and habitat for fish and game. In other cases agricultural chemical in the runoff cause pollution.

Read more about this topic:  Columbia Basin Project

Famous quotes containing the words unintended and/or consequences:

    I thank heaven that the 4th. of July is over. It is always a day of great fatigue to me, and of some embarrassments from improper intrusions and some from unintended exclusions.
    Thomas Jefferson (1743–1826)

    The middle years are ones in which children increasingly face conflicts on their own,... One of the truths to be faced by parents during this period is that they cannot do the work of living and relating for their children. They can be sounding boards and they can probe with the children the consequences of alternative actions.
    Dorothy H. Cohen (20th century)