Columbia Basin Project

The Columbia Basin Project (or CBP) in Central Washington, USA, is the irrigation network that the Grand Coulee Dam makes possible. It is the largest water reclamation project in the United States, supplying irrigation water to over 670,000 acres (2,700 km2) of the 1,100,000 acres (4,500 km2) large project area, all of which was originally intended to be supplied and is still classified as irrigable and open for the possible enlargement of the system. Water pumped from the Columbia River is carried over 331 miles (533 km) of main canals, stored in a number of reservoirs, then fed into 1,339 miles (2,155 km) of lateral irrigation canals, and out into 3,500 miles (5,600 km) of drains and wasteways.

Read more about Columbia Basin Project:  History, Geology, Irrigation of The Columbia Basin, Unintended Consequences, Environmental Impact, Economic Benefits and Costs

Famous quotes containing the words columbia and/or project:

    The young women, what can they not learn, what can they not achieve, with Columbia University annex thrown open to them? In this great outlook for women’s broader intellectual development I see the great sunburst of the future.
    M. E. W. Sherwood (1826–1903)

    They had their fortunes to make, everything to gain and nothing to lose. They were schooled in and anxious for debates; forcible in argument; reckless and brilliant. For them it was but a short and natural step from swaying juries in courtroom battles over the ownership of land to swaying constituents in contests for office. For the lawyer, oratory was the escalator that could lift a political candidate to higher ground.
    —Federal Writers’ Project Of The Wor, U.S. public relief program (1935-1943)