Central Area Transmission System - History

History

The receiving terminal site for the system was built between 1990 and 1993. It was originally run by Amoco. The CATS pipeline was completed in 1993, receiving gas from two of Amoco's fields: Everest and Lomond, now owned by BG. Further processing facilities were added in 1997. Plans for the site began from the discovery of BP's Lomond field in May 1972. In addition, other fields were discovered in the Central Graben Area of the North Sea.

In July 2007, the CATS pipeline was damaged by the anchor of the vessel 'Young Lady'. The pipeline was shut-in for two months.

Read more about this topic:  Central Area Transmission System

Famous quotes containing the word history:

    In history an additional result is commonly produced by human actions beyond that which they aim at and obtain—that which they immediately recognize and desire. They gratify their own interest; but something further is thereby accomplished, latent in the actions in question, though not present to their consciousness, and not included in their design.
    Georg Wilhelm Friedrich Hegel (1770–1831)

    He wrote in prison, not a History of the World, like Raleigh, but an American book which I think will live longer than that. I do not know of such words, uttered under such circumstances, and so copiously withal, in Roman or English or any history.
    Henry David Thoreau (1817–1862)

    A man acquainted with history may, in some respect, be said to have lived from the beginning of the world, and to have been making continual additions to his stock of knowledge in every century.
    David Hume (1711–1776)