The Brunswick nuclear power plant, named for the county in which it is located, covers 1,200 acres (490 ha). The site is adjacent to the town of Southport, North Carolina, and to wetlands and woodlands, and was opened in 1975.
The site contains two General Electric boiling water reactors, which are cooled by water collected from the Cape Fear River and discharged into the Atlantic Ocean.
Progress Energy is the majority owner (81.7%) and operator of the Brunswick nuclear plant. The North Carolina Eastern Municipal Power Agency owns the remaining 18.3%.
The Brunswick plants' proximity to the Cape Fear River and the Atlantic Ocean allowed the designers to take in cooling water from the Cape Fear river and discharge it into the Atlantic off the coast of Oak Island. Fish, crustaceans, and other debris are removed from the cooling water via a filtration system. The water then flows through the nuclear plant and discharges into a five mile long canal which passes under the Intra-Coastal Waterway at one point.
Read more about Brunswick Nuclear Generating Station: Surrounding Population, Seismic Risk
Famous quotes containing the words nuclear and/or station:
“Language is as real, as tangible, in our lives as streets, pipelines, telephone switchboards, microwaves, radioactivity, cloning laboratories, nuclear power stations.”
—Adrienne Rich (b. 1929)
“If you have any information or evidence regarding the O.J. Simpson case, press 2 now. If you are an expert in fields relating to the O.J. Simpson case and would like to offer your services, press 3 now. If you would like the address where you can send a letter of support to O.J. Simpson, press 1 now. If you are seeking legal representation from the law offices of Robert L. Shapiro, press 4 now.”
—Advertisement. Aired August 8, 1994 by Tom Snyder on TV station CNBC. Chicago Sun Times, p. 11 (July 24, 1994)