BR Standard Class 8 - Operational Details

Operational Details

The Duke was highly unpopular with crews, who regarded it as something of a liability due to its poor steam production. Inefficiencies caused by the aforementioned problems regarding the draughting abilities and firebox design meant that no further examples were constructed. The fact that no effort was made to rectify these problems indicates the change in policy regarding steam locomotives, with the Modernisation Plan entering circulation as the "Duke" entered service. Based for its entire working life at Crewe North depot, the locomotive was utilised in hauling boat trains on the undemanding North Wales Coast Line between Crewe and Holyhead. All of this culminated in the locomotive having a short service life of only eight years, being withdrawn from service in 1962. The reputation of the locomotive amongst its crews as being a poor steamer was eventually to disappear – but only after it was rescued from the scrapyard during 1974.

Read more about this topic:  BR Standard Class 8

Famous quotes containing the word details:

    Then he told the news media
    the strange details of his death
    and they hammered him up in the marketplace
    and sold him and sold him and sold him.
    My death the same.
    Anne Sexton (1928–1974)