Design Details
The design and construction took place at the ex-GWR Swindon Works, along with the 2-6-0 tender engine version of the class. Although the boiler shared flanged plates with the GWR No.2 boiler the barrel was shortened by 5 13⁄16 inches and a dome added. Strangely they did not share the same design of wheels as the Doncaster-designed BR Standard Class 4 2-6-0 (76XXX), which also had 5 ft 3 in (1,600 mm) driving wheels and the same piston stoke, and hence crank-pin throw.
In common with a number of the other BR Standard Classes, the chassis design used a number of LMS-designed components including Brake Hanger Brackets, Flexible Stretcher Brackets and Reversing Shaft Brackets.
The cylinder covers of engines as built were fitted with "screw-in" type pressure relief valves. From September 1955 revised cylinder covers were introduced for renewals incorporating "bolt-on" type pressure relief valves.
Although the chassis had many almost identical parts to the LMS Ivatt Class 4 the motion brackets were derived from the design of those fitted to the LMS Ivatt Class 2 2-6-0 and LMS Ivatt Class 2 2-6-2T.
Unlike a number of the larger BR Standards the exhaust steam manifold within the smokebox saddle was a steel fabrication that was part of the welded saddle. In a number of the large BR standards (BR Standard Class 6 and Class 7 engines) the exhaust steam manifold was a steel casting welded into the saddle during manufacture.
Read more about this topic: BR Standard Class 3 2-6-2T
Famous quotes containing the words design and/or details:
“Joe ... you remember I said you wouldnt be cheated?... Nobody is really. Eventually all things work out. Theres a design in everything.”
—Sidney Buchman (19021975)
“Then he told the news media
the strange details of his death
and they hammered him up in the marketplace
and sold him and sold him and sold him.
My death the same.”
—Anne Sexton (19281974)