A team of surveyors were commissioned to survey the route for the KCR British Section in 1905. Two routes have been proposed:
- Construction of a tunnel 1.5 mile (2.4 km) long through Beacon Hill then following the west coast of Tolo Harbour
- Routing through Western New Territories and Castle Peak Bay
Although option 2 was less of an engineering challenge, the overall route was longer, and passed through less economically active areas; therefore option 1 was selected. Works on the 35.4 kilometers (22.0 mi) railway to the border started early 1906. Construction of the tunnel, referred to as Tunnel No.2 in the plan (since it was the second tunnel starting from Kowloon), was the greatest engineering project in Asia of its time.
The tunnel opened with rest of the line in October 1910, together with four smaller tunnels. It accommodated a single standard track with a standard gauge of 1,435 mm (4 ft 8 1⁄2 in). It has, however, been notorious for its fume problems throughout its operating life; due to its steep gradient of 1%.
A double tracked, electrified tunnel was built to 30 to 40 metres west of the original one as part of the modernisation of the KCR. Work started in 1978, and was completed by 1981, the railway now the MTR East Rail Line. The original tunnel was closed upon completion of the new tunnel, and is now occupied by a 750 mm diameter town gas pipeline.
Read more about this topic: Beacon Hill Tunnel
Famous quotes containing the word history:
“And now this is the way in which the history of your former life has reached my ears! As he said this he held out in his hand the fatal letter.”
—Anthony Trollope (18151882)
“No matter how vital experience might be while you lived it, no sooner was it ended and dead than it became as lifeless as the piles of dry dust in a school history book.”
—Ellen Glasgow (18741945)
“Its nice to be a part of history but people should get it right. I may not be perfect, but Im bloody close.”
—John Lydon (formerly Johnny Rotten)