The project foresaw a capacity of 5–7.2 million tonnes of LNG per year, depending on whether one or two LNG trains would be built. The LNG plant was expected to cost US$3.7 billion and it was to become operational by 2012. The technically design of the project was done by Giprospetsgaz, a subsidiary of Gazprom, and KBR, a subsidiary of Halliburton. The LNG plant was to be supplied from the Russian unified natural gas grid, including from the onshore section of Nord Stream pipeline, and from the Shtokman field.