Baltic Cable - Expansion Schemes

Expansion Schemes

Of the two originally planned 380 kV lines to Lübeck (from Krümmel Nuclear Power Plant to Lübeck-Siems and from Schwerin substation to Lübeck-Herrenwyk), the 380 kV line between Krümmel and Lübeck-Siems was canceled according to speakers from E.ON AG.

There is still the option to build a 380 kV line from Lübeck to another 380 kV substation in Schleswig-Holstein, Hamburg or Lower Saxony. The construction of the 380 kV link between Lübeck-Herrenwyk and Schwerin is not progressing due to opposition from ecologists.

A transmission rating of 600 MW should be possible via a new 220 kV cable and a static var compensator in Lübeck-Siems after 2005.

Read more about this topic:  Baltic Cable

Famous quotes containing the words expansion and/or schemes:

    We are caught up Mr. Perry on a great wave whether we will or no, a great wave of expansion and progress. All these mechanical inventions—telephones, electricity, steel bridges, horseless vehicles—they are all leading somewhere. It’s up to us to be on the inside in the forefront of progress.
    John Dos Passos (1896–1970)

    Science is a dynamic undertaking directed to lowering the degree of the empiricism involved in solving problems; or, if you prefer, science is a process of fabricating a web of interconnected concepts and conceptual schemes arising from experiments and observations and fruitful of further experiments and observations.
    James Conant (1893–1978)