Angels Flight - Repaired

Repaired

On November 1, 2008, both of the repaired and restored Angels Flight cars, Sinai and Olivet, were put back on their tracks and, on January 16, 2009, testing began on the railway. On November 20, 2009, another step in the approval process was achieved. On March 10, 2010, the California Public Utilities Commission approved the safety certificate for the railroad to begin operating again.

The new drive and safety system completely replaced the system which was the cause the fatal 2001 accident. Like the original Angels Flight design and most traditional funicular systems, the new drive system incorporates a single main haulage cable, with one car attached to each end. Also like the original design, a second safety cable is utilized. To further enhance safety, unlike the original design, each car now has a rail brake system, as a backup to the main backup emergency brakes on each bull-wheel. Another added safety feature is an independent evacuation motor to move the cars should the main motor fail for any reason.

Read more about this topic:  Angels Flight