Almaty Metro - System

System

Upon completion, the metro system will total 45 km in length.

The first section of Line 1 has a length of 8.56 km and seven stations (four deep-level stations and three sub-surface stations). 7 trains operate on the first line. The construction cost is estimated at 101 billion tenge ($1 billion).

The metro will expand in the future. Construction of Sairan and Molodejnaya stations started in 2011.

Read more about this topic:  Almaty Metro

Famous quotes containing the word system:

    Delight at having understood a very abstract and obscure system leads most people to believe in the truth of what it demonstrates.
    —G.C. (Georg Christoph)

    The dominant metaphor of conceptual relativism, that of differing points of view, seems to betray an underlying paradox. Different points of view make sense, but only if there is a common co-ordinate system on which to plot them; yet the existence of a common system belies the claim of dramatic incomparability.
    Donald Davidson (b. 1917)

    ... in America ... children are instructed in the virtues of the system they live under, as though history had achieved a happy ending in American civics.
    Mary McCarthy (1912–1989)