System
Upon completion, the metro system will total 45 km in length.
The first section of Line 1 has a length of 8.56 km and seven stations (four deep-level stations and three sub-surface stations). 7 trains operate on the first line. The construction cost is estimated at 101 billion tenge ($1 billion).
The metro will expand in the future. Construction of Sairan and Molodejnaya stations started in 2011.
Read more about this topic: Almaty Metro
Famous quotes containing the word system:
“Some rough political choices lie ahead. Should affirmative action be retained? Should preference be given to people on the basis of income rather than race? Should the system beand can it bescrapped altogether?”
—David K. Shipler (b. 1942)
“UG [universal grammar] may be regarded as a characterization of the genetically determined language faculty. One may think of this faculty as a language acquisition device, an innate component of the human mind that yields a particular language through interaction with present experience, a device that converts experience into a system of knowledge attained: knowledge of one or another language.”
—Noam Chomsky (b. 1928)
“Human beings are compelled to live within a lie, but they can be compelled to do so only because they are in fact capable of living in this way. Therefore not only does the system alienate humanity, but at the same time alienated humanity supports this system as its own involuntary masterplan, as a degenerate image of its own degeneration, as a record of peoples own failure as individuals.”
—Václav Havel (b. 1936)