Cherry Street Extension
The first element of the Port Lands streetcar right-of-way network will be a short stretch of track on the east side of Cherry Street from King Street south to the north side of the railroad corridor. This initial segment would only add three stops to the TTC network, but will later be expanded to Queen's Quay. Once constructed, every third or fourth eastbound 504 King streetcar will be turned down Cherry Street instead of going to Broadview Station. The re-construction of Cherry Street will start in 2011 and be completed by 2013.
Read more about this topic: 504 King
Famous quotes containing the words cherry, street and/or extension:
“Lay down, lay down the bigly bier,
Lat me the dead look on;
Wi cherry cheeks and ruby lips
She lay an smild on him.
O ae sheave o your bread, true-love,
An ae glass o your wine,
For I hae fasted for your sake
These fully day [is] nine.”
—Anna Gordon Brown (17471810)
“He has given me six hundred street signs.
The time I was dancing he built a museum.
He built ten blocks when I moved on the bed.
He constructed an overpass when I left.”
—Anne Sexton (19281974)
“Tis the perception of the beautiful,
A fine extension of the faculties,
Platonic, universal, wonderful,
Drawn from the stars, and filtered through the skies,
Without which life would be extremely dull.”
—George Gordon Noel Byron (17881824)