24 Cm Haubitze 39 - Description and Development

Description and Development

Škoda designed it for export and Turkey ordered a batch, but only received two before the Germans occupied Czechoslovakia in March 1939. It was a stablemate of the Škoda 21 cm Kanone 39 and used virtually the same mounting and transport arrangements. It used an interrupted screw breech with a deBange obdurator to provide the gas seal with bagged propellant. The carriage revolved on a ball-race firing platform that had to be dug-in before firing, a task that took six to eight hours to accomplish. It broke down into three loads for transport, the barrel, carriage and the ground platform. A modified version entered service in 1942 as the H 39/40 although the changes merely simplified production. A total of eighteen were delivered to Germany.

Read more about this topic:  24 Cm Haubitze 39

Famous quotes containing the words description and/or development:

    Everything to which we concede existence is a posit from the standpoint of a description of the theory-building process, and simultaneously real from the standpoint of the theory that is being built. Nor let us look down on the standpoint of the theory as make-believe; for we can never do better than occupy the standpoint of some theory or other, the best we can muster at the time.
    Willard Van Orman Quine (b. 1908)

    I can see ... only one safe rule for the historian: that he should recognize in the development of human destinies the play of the contingent and the unforeseen.
    —H.A.L. (Herbert Albert Laurens)