EVAs
Start Date/Time | Duration | End Time | Spacecraft | Crew | Function | Remarks |
---|---|---|---|---|---|---|
8 January 23:08 |
3 hours 6 minutes |
9 January 02:14 |
Mir EO-24 | Anatoly Solovyev Pavel Vinogradov |
Repaired the damaged airlock sealing system, used the Strela boom to move across Mir and recover an American optical monitoring experiment. Checked the integrity of cable connects to several antennas. | |
14 January 21:12 |
3 hours 52 minutes |
15 January 01:04 |
Mir EO-24 | Anatoly Solovyev David Wolf |
Continued to make more repairs to the airlock hatch on Kvant-2 and used a handheld photo-reflectometer to inspect the exterior surface of the station. | |
1 April 13:35 |
6 hours 40 minutes |
20:15 | Mir EO-25 | Talgat Musabayev Nikolai Budarin |
Installed a set of handrails and one of two foot restraints on the outside of the Spektr module in preparation for the repair of the damaged solar array. | |
6 April 13:35 |
4 hours 15 minutes |
17:50 | Mir EO-25 | Talgat Musabayev Nikolai Budarin |
Begin repair of the damaged Spektr solar panel. After installing a splint on the frayed panel, the spacewalkers had to quickly return to the airlock to handle a problem with station attitude control. | |
11 April 09:55 |
6 Hours 25 minutes |
16:20 | Mir EO-25 | Talgat Musabayev Nikolai Budarin |
Jettisoned the external thruster engine (VDU) that had been located at the top of the Sofora boom and recover an experiment from the Rapana structure. | Dismantling of the Rapana structure was not completed. |
17 April 07:40 |
6 Hours 33 minutes |
14:13 | Mir EO-25 | Talgat Musabayev Nikolai Budarin |
Removed two structures and secured them to exterior surfaces and repositioned the new thrust engine (VDU) for future use. | |
22 April 05:34 |
6 Hours 21 minutes |
11:55 | Mir EO-25 | Talgat Musabayev Nikolai Budarin |
Completed installation of the new VDU thruster unit on top of the Sofora boom. | |
15 September 20:00 |
30 minutes | 20:30 | Mir EO-26 | Gennady Padalka Sergei Avdeyev |
Internal spacewalk in the depressurised Spektr module to connect electrical and control cables to the solar array servo motor. | |
10 November 19:24 |
5 hours 54 minutes |
11 November 01:18 |
Mir EO-26 | Gennady Padalka Sergei Avdeyev |
Deployed Sputnik-41, deployed a French "meteorite trap" intended to catch some dust from the upcoming Leonids meteor shower. | |
7 December 22:10 |
7 hours 21 minutes |
8 December 05:31 |
STS-88 ISS Endeavour |
Jerry L. Ross James H. Newman |
Connected computer and electrical cables between the Unity node, the two mating adapters attached to either end of Unity, and the Zarya Functional Cargo Block (FGB). | First ISS assembly EVA |
9 December 20:33 |
7 hours 2 minutes |
10 December 03:35 |
STS-88 ISS Endeavour |
Jerry L. Ross James H. Newman |
Installed two box-like antennas on the outside of the Unity module that are part of the S-band early communications system. | |
12 December 20:33 |
6 hours 59 minutes |
13 December 03:32 |
STS-88 ISS Endeavour |
Jerry L. Ross James H. Newman |
Checked on an insulation cover on a cable connection on the lower Pressurized Mating Adapter (PMA-2) to make sure it was fully installed, attached EVA tools on the side of Unity's upper mating adapter (PMA-1) in preparation for future EVAs, and inspected Orbiter Space Vision System targets on Unity. |
Read more about this topic: 1998 In Spaceflight