Modern Tunnel Boring Machines
A tunnel boring machine (TBM), consists of a shield (a large metal cylinder) and trailing support mechanisms.
At the front end of the shield a rotating cutting wheel is located. Behind the cutting wheel there is a chamber where, depending on the type of the TBM, the excavated soil is either mixed with slurry (so-called slurry TBM) or left as-is (earth pressure balance or EPB shield). The choice for a certain type of TBM depends on the soil conditions. Systems for removal of the soil (or the soil mixed with slurry) are also present.
Behind the chamber there is a set of hydraulic jacks supported by the finished part of the tunnel which are used to push the TBM forward. Once a certain distance has been excavated (roughly 1.5-2 meters), a new tunnel ring is built using the erector. The erector is a rotating system which picks up precast concrete segments and places them in the desired position.
Behind the shield, inside the finished part of the tunnel, several support mechanisms which are part of the TBM can be found: dirt removal, slurry pipelines if applicable, control rooms, rails for transport of the precast segments, etc.
Read more about this topic: Tunnelling Shield
Famous quotes containing the words modern, tunnel, boring and/or machines:
“I ask especially that no state shall, by law or otherwise, authorize the return of the saloon, either in its old form or in some modern guise.”
—Franklin D. Roosevelt (18821945)
“The only way to find out anything about what kinds of lives people led in any given period is to tunnel into their records and to let them speak for themselves.”
—John Dos Passos (18961970)
“Without music to decorate it, time is just a bunch of boring production deadlines or dates by which bills must be paid.”
—Frank Zappa (19401993)
“As machines become more and more efficient and perfect, so it will become clear that imperfection is the greatness of man.”
—Ernst Fischer (18991972)