Suitland Parkway - Route Description

Route Description

The Suitland Parkway begins at an interchange with I-295 and South Capitol Street in Washington, D.C., heading southeast as a four-lane divided highway. The road intersects Firth Sterling Avenue SE at a traffic light and a railroad line at-grade before passing near residential areas as a limited-access road and curving to the south. The parkway comes to a westbound exit for Sheridan Road SE and an eastbound entrance from Sumner Road SE. that provides access to Martin Luther King, Jr. Avenue SE. At the intersection of Sheridan Road SE and Pomeroy Road SE, a bike path begins and runs parallel to the westbound lanes of the parkway through the remainder of Washington, D.C. Past this, the Suitland Parkway curves east through woods and reaches a traffic light with Stanton Road SE. The road curves southeast and comes to a full interchange with Alabama Avenue SE, with access to and from the westbound direction of the parkway provided by Irving Street SE. Following this, the parkway heads east into woods.

At the bridge that carries Southern Avenue SE over the parkway, the Suitland Parkway enters Prince George's County in Maryland. The road heads northeast into Temple Hills, coming to traffic light with MD 637 north of the Naylor Road station on Washington Metro's Green Line. Left turns are prohibited at the MD 637 intersection. A short distance later, the parkway comes to an interchange with MD 5. Past this interchange, the Suitland Parkway continues east and passes under the Green Line, with the median widening as it continues southeast through woods. The median narrows again as the road comes to an interchange with MD 458 in Suitland near the Suitland station on the Green Line. Past MD 458, the parkway median widens again and the road continues through woodland a short distance to the southwest of the Green Line. The road has an at-grade intersection with Meadowview Drive, which heads south into a residential development, before the subway line passes over the parkway to head south. The Suitland Parkway curves east and the median narrows as the road comes to an interchange with Suitland Road. The road continues east through more woods with nearby development, with the median widening as the road comes to a traffic light with MD 337. It is at this point that southbound MD 337 splits from the westbound Suitland Parkway. The parkway passes under I-95/I-495 without an interchange before northbound MD 337 merges onto the eastbound direction of the parkway via a ramp. At this point, the Suitland Parkway passes to the north of Joint Base Andrews and comes to an interchange that provides access to the north gate of the base. A short distance later, both MD 337 and the Suitland Parkway end at a traffic light with MD 4 in Forestville.

Commercial vehicles, such as trucks, are prohibited from the entire length of the Suitland Parkway.

Read more about this topic:  Suitland Parkway

Famous quotes containing the words route and/or description:

    But however the forms of family life have changed and the number expanded, the role of the family has remained constant and it continues to be the major institution through which children pass en route to adulthood.
    Bernice Weissbourd (20th century)

    As they are not seen on their way down the streams, it is thought by fishermen that they never return, but waste away and die, clinging to rocks and stumps of trees for an indefinite period; a tragic feature in the scenery of the river bottoms worthy to be remembered with Shakespeare’s description of the sea-floor.
    Henry David Thoreau (1817–1862)