The price of energy inputs and the environmental costs of every nuclear power plant continue long after the facility has finished generating its last useful electricity. Both nuclear reactors and uranium enrichment facilities must be decommissioned, returning the facility and its parts to a safe enough level to be entrusted for other uses. After a cooling-off period that may last as long as a century, reactors must be dismantled and cut into small pieces to be packed in containers for final disposal. The process is very expensive, time-consuming, dangerous for workers, hazardous to the natural environment, and presents new opportunities for human error, accidents or sabotage.

The total energy required for decommissioning can be as much as 50% more than the energy needed for the original construction. In most cases, the decommissioning process costs between US $300 million to US$5.6 billion. Decommissioning at nuclear sites which have experienced a serious accident are the most expensive and time-consuming. In the U.S. there are 13 reactors that have permanently shut down and are in some phase of decommissioning, but none of them have completed the process.

Read more about this topic:  Nuclear Power In The United States

Famous quotes containing the word plant:

    You have waited, you always wait, you dumb, beautiful ministers,
    We receive you with free sense at last, and are insatiate
    hence-forward,
    Not you any more shall be able to foil us, or withhold yourselves
    from us,
    We use you, and do not cast you aside—we plant you permanently within us,
    We fathom you not—we love you—there is perfection in you also,
    You furnish your parts, toward eternity,
    Great or small, you furnish your parts toward the soul.
    Walt Whitman (1819–1892)