Integrated Electronic Control Centre

The Integrated Electronic Control Centre (IECC) was developed in the late 1980s by the British Rail Research Division for UK-based railway signalling centres, although variations exist around the world. It is the most widely deployed VDU based signalling control system in the UK, with over 50 workstations in control centres that manage many of the most complex and busy areas of the network.

IECC consists of a number of operator’s workstations with VDU/LCD displays which depict the control area and is semi-automatic using Automatic Route Setting (ARS) - a computer based route setting system driven from a pre-programmed timetable database. ARS can also handle severely disrupted service patterns and assist the signaller in the event of train or infrastructure failures.

IECCs were developed as an alternative to the traditional switch or button panel control, which in turn replaced mechanical lever frames. From the start, they controlled Solid State Interlockings (SSIs), a software version of the traditional relay interlocking, but existing relay interlockings may also be controlled from an IECC. The system can control as many miles of track as required, but typically around 50-100 miles.

Recently, PC-based control systems, similar to the IECC have been developed and are sold by various signalling contractors, e.g. Westinghouse Rail Systems WESTCAD.

Early history

The concept of IECC was developed at the Railway Technical Centre in Derby during the 1980s, and in particular the initial software for ARS and SSI. A contract for the development of an operational standard system was let in January 1987 to CAP Group, including the supply of a complete system for Yoker (Glasgow) and the ARS for the Waterloo area. This was the first time a software house became involved in railway signalling after competing against the main incumbent suppliers of GEC-General Signal and Westinghouse Signals Ltd. The solution used off-the-shelf microcomputer technology (Motorola 68000 microprocessors and VME Bus) to host the sub-systems of IECC in high availability configurations linked via a duplicated Nine Tiles Superlink local area network. Subsequent contracts were let to CAP Group (became Sema Group in 1988) for further operational IECC systems involving the supply of turnkey hardware and software. These included the first IECC to go live at Liverpool Street in Easter 1989 quickly followed by York.

Later developments

As a result of UK railway privatisation in the mid 1990s, British Rail Research was bought by AEA Technology Rail, who took over the supply of new IECCs, support for the existing installed base, and enhancements to the hardware and software. In 2006, the AEA rail business became DeltaRail Group Limited, who have developed IECC Scalable which replicates all the functionality of the original IECC on a modern hardware platform and software architecture. Following a successful 6 month trial at Swindon B in 2012, IECC Scalable is now the standard for new installations, starting with Cambridge where it controls the Ely-Norwich line which has been resignalled on the "modular signalling" concept for secondary routes.

Read more about Integrated Electronic Control Centre:  List of IECCs in Service As At 1 November 2012

Famous quotes containing the words integrated, electronic, control and/or centre:

    Science is intimately integrated with the whole social structure and cultural tradition. They mutually support one other—only in certain types of society can science flourish, and conversely without a continuous and healthy development and application of science such a society cannot function properly.
    Talcott Parsons (1902–1979)

    The war was won on both sides: by the Vietnamese on the ground, by the Americans in the electronic mental space. And if the one side won an ideological and political victory, the other made Apocalypse Now and that has gone right around the world.
    Jean Baudrillard (b. 1929)

    If someone does something we disapprove of, we regard him as bad if we believe we can deter him from persisting in his conduct, but we regard him as mad if we believe we cannot. In either case, the crucial issue is our control of the other: the more we lose control over him, and the more he assumes control over himself, the more, in case of conflict, we are likely to consider him mad rather than just bad.
    Thomas Szasz (b. 1920)

    In the centre of his cage
    The pacing animal
    Surveys the jungle cove
    And slicks his slithering wiles
    To turn the venereal awl
    In the livid wound of love.
    Allen Tate (1899–1979)