Forsmark NPP has three Boiling water reactors:
- F1 with an ABB Atom BWR 69 at 2928 MW thermal and 1010 MWe net was first connected to the grid on 5 June 1980, and commenced commercial operation on 10 December 1980. It has two turbo-alternators.
- F2 with an ABB Atom BWR 69 at 2928 MW thermal and 1010 MWe net was first grid connected on 15 December 1980 and commenced commercial operation on 7 July 1981. It is a twin of Unit 1.
- F3 with an ABB Atom BWR 75 at 3300 MW thermal and 1190 MWe net and was first grid connected on 3 March 1985 and commenced commercial operation on 21 August 1985. It is a later design with one turbo-alternator.