Plot
A terrorist biological warfare doomsday event has played out, killing off 80% of the world's population. Many of the survivors are sick or eventually become insane. A group of surviving soldiers attempt to care for survivors and maintain order on their military base. Over time, the situation gradually becomes so dire that the commander orders all sick transported 70 miles (110 km) away to an abandoned village, and orders his troops to open fire on anything within a 30 miles (48 km) radius.
Kat (Eileen Weisinger), a helicopter pilot, returns from a reconnaissance mission to find her military base destroyed. Nighthorse (Stuart W. Yee) suggests that it was done by a nuclear weapon launched by a Soviet "boomer". Weeks later, Grier (Al Qualls) makes contact with an island 300 miles (480 km) away, which reported to be clear of the sick and capable of receiving refugees. Nighthorse, Grier, Kat and the player, an anonymous soldier, set off in two AH-64 Apache attack helicopters.
En route, the helicopter carrying Grier and the player develops mechanical problems and require a replacement part had by the pair on the other helicopter. The player's helicopter is forced to set down on an island, landing on the rooftop of a factory compound. As Nighthorse and Kat circle, they are fired upon and shot down by a surface-to-air missile. Nighthorse is fatally wounded and orders Kat to deliver the part to the other team.
Kat makes her way to the compound entrance where she makes radio contact with the player, who is in a factory control room. The player relays his situation to Kat: Grier was dead while he was wounded and immobile. The pair had been caught in a booby trap when trying to enter the control room. The player can observe Kat's actions through a series of security cameras as well as Kat's camera headset. However, the headset is quickly damaged, and Kat can no longer receive audio signals from the player. Relying instead on sending simple instructions to Kat through a signaling keypad, the player must guide Kat through the factory to his position. Kat reveals that she has only nine bullets for her Uzi.
The player assists Kat as she makes her way through the factory by activating or deactivating machinery, relaying directional commands and setting off booby traps. The function of the various machinery and booby traps is hinted at in the deranged ramblings contained a black notebook the player finds in the control room. As time passes, the identity of the facility's operator, General Minh (Min Yee) is revealed to the player, as is its function. At first blush, it appears as though Kat is making her way through a steel mill which manufactures large metal crosses. However, Kat eventually discovers a cross partially filled with a white powder she identifies as illicit drugs. She also discovers a torture chamber and meets a prisoner (Brian Bernasconi) who attempts to kill her for her gun. The player saves Kat with a booby trap, and she moves on.
As Kat approaches the rooftop, she is confronted by Minh, carrying an M60 machine gun. The player successfully distracts Minh, while Kat shoots him and makes her way to the player. As the helicopter lifts off, Minh stands up and begins firing on the two as they hover. Kat aims a TV-guided missile at Minh and fires, and the helicopter veers away. Minh is killed in a flaming explosion and the helicopter flies off into the sunset.
Read more about this topic: Critical Path (video Game)
Famous quotes containing the word plot:
“If you need a certain vitality you can only supply it yourself, or there comes a point, anyway, when no ones actions but your own seem dramatically convincing and justifiable in the plot that the number of your days concocts.”
—John Ashbery (b. 1927)
“The plot! The plot! What kind of plot could a poet possibly provide that is not surpassed by the thinking, feeling reader? Form alone is divine.”
—Franz Grillparzer (17911872)
“But, when to Sin our byast Nature leans,
The careful Devil is still at hand with means;
And providently Pimps for ill desires:
The Good Old Cause, revivd, a Plot requires,
Plots, true or false, are necessary things,
To raise up Common-wealths and ruine Kings.”
—John Dryden (16311700)