Critical Path (video Game)

Critical Path (video Game)

Intel 80386 33 MHz or compatible,
4 MB RAM,
640x480 Super VGA with 256 colors (65,536 recommended),
1x CD-ROM drive,
8-bit Windows compatible sound card,
10 MB hard disk space,
Windows 3.x (newer with compatibility mode)

Critical Path is a post-apocalyptic interactive movie adventure video game developed by Mechadeus (now Mondo Media) and published by Media Vision Technology. Critical Path was one of earliest games to be released on CD-ROM, and featured real time video which made it appear to be graphically superior to most games of its time. In actuality, the entire game was an interactive movie, where most choices would simply cause the game to progress or end.

Read more about Critical Path (video Game):  Plot, Development, Reception

Famous quotes containing the words critical and/or path:

    “Productive collaborations between family and school, therefore, will demand that parents and teachers recognize the critical importance of each other’s participation in the life of the child. This mutuality of knowledge, understanding, and empathy comes not only with a recognition of the child as the central purpose for the collaboration but also with a recognition of the need to maintain roles and relationships with children that are comprehensive, dynamic, and differentiated.”
    —Sara Lawrence Lightfoot (20th century)

    “Examples are cited by soldiers, of men who have seen the cannon pointed, and the fire given to it, and who have stepped aside from he path of the ball. The terrors of the storm are chiefly confined to the parlour and the cabin.”
    —Ralph Waldo Emerson (1803–1882)