Bowdoin College - Sustainability

Sustainability

According to its Environmental Mission Statement, Bowdoin College "shall seek to encourage conservation, recycling, and other sustainable practices in its daily decision making processes, and shall take into account, in the operations of the College, all appropriate economic, environmental, and social concerns."

Between 2002 and 2008, Bowdoin College decreased its CO2 emissions by 40%. It achieved that reduction by switching from #6 to #2 oil in its heating plant, reducing the campus set heating point from 72 to 68 degrees, and by adhering to its own Green Design Standards in renovations. In addition, Bowdoin runs a single stream recycling program, and its dining services department has begun composting food waste and unbleached paper napkins. Bowdoin received an overall grade of "B" for its sustainability efforts on the College Sustainability Report Card 2009 published by the Sustainable Endowments Institute. In addition to various student run organizations, including Sustainable Bowdoin and the Bowdoin Organic Garden, the college's dining service regularly uses local products and annually invites local farmers to campus to discuss how local food products are incorporated into the daily menu for students.

In 2003, Bowdoin made a commitment to achieve LEED-certification for all new campus buildings. The college has since completed construction on Osher and West residency halls, the Peter Buck Center for Health & Fitness, and the Sidney J. Watson Arena, all of which have attained LEED or Silver LEED certification. The new dorms partially use collected rain water as part of an advanced flushing system, while the new ice arena uses one of the most efficient dehumidification and refrigeration systems out of any Division III collegiate arena.

In 2009, the college announced a detailed plan to achieve carbon neutrality by 2020 as a result of campus-wide conservation efforts and specific initiatives in its implementation plan. The plan includes the construction of a solar thermal system, part of the "Thorne Solar Hot Water Project"; cogeneration in the central heating plant (for which Bowdoin received $400,000 in federal grants); lighting upgrades to all campus buildings; and modern monitoring systems of energy usage on campus.

Read more about this topic:  Bowdoin College