Xinyi Line (Taipei Metro) - Line Construction

Line Construction

Tunnel construction between stations will use the shield-tunneling method, while other construction (stations, crossover track, etc.) will use the cut-and-cover method.

The Xinyi Line construction progress is, as of May 2012, 83.29% complete. Upon completion, it will take 11 minutes to travel from the Taipei 101/World Trade Center to Taipei Main Station. A common utility duct was constructed along with the line, saving NT$44.64 million in the process. Following completion of the line, dedicated bus lanes will be moved back towards the center of the road.

A planned extension of the line will extend the line east along Xinyi Rd. and Fude Rd. to Zhongpo South Rd., and end at Yucheng Park. It will add 2 stations and 1.6 km (0.99 mi) of additional route length. The final corridor was approved on February 12, 2010.

Read more about this topic:  Xinyi Line (Taipei Metro)

Famous quotes containing the words line and/or construction:

    “I love them
    for finding what
    I can’t find,
    and for loving me
    for the line I wrote,
    and for forgetting it....”
    —Denise Levertov (b. 1923)

    “Striving toward a goal puts a more pleasing construction on our advance toward death.”
    —Mason Cooley (b. 1927)