Line Construction

Tunnel construction between stations will use the shield-tunneling method, while other construction (stations, crossover track, etc.) will use the cut-and-cover method.

The Xinyi Line construction progress is, as of May 2012, 83.29% complete. Upon completion, it will take 11 minutes to travel from the Taipei 101/World Trade Center to Taipei Main Station. A common utility duct was constructed along with the line, saving NT$44.64 million in the process. Following completion of the line, dedicated bus lanes will be moved back towards the center of the road.

A planned extension of the line will extend the line east along Xinyi Rd. and Fude Rd. to Zhongpo South Rd., and end at Yucheng Park. It will add 2 stations and 1.6 km (0.99 mi) of additional route length. The final corridor was approved on February 12, 2010.

Read more about this topic:  Xinyi Line (Taipei Metro)

Famous quotes containing the words line and/or construction:

    What we are, that only can we see. All that Adam had, all that Caesar could, you have and can do. Adam called his house, heaven and earth; Caesar called his house, Rome; you perhaps call yours, a cobbler’s trade; a hundred acres of ploughed land; or a scholar’s garret. Yet line for line and point for point, your dominion is as great as theirs, though without fine names. Build, therefore, your own world.
    Ralph Waldo Emerson (1803–1882)

    There’s no art
    To find the mind’s construction in the face.
    William Shakespeare (1564–1616)