Wrington Vale Light Railway - Construction and Traffic

Construction and Traffic

The railway's primary purpose was to bring construction materials for the building of the Blagdon Lake reservoir. Construction of the line overran cost and time forecasts. It was constructed and owned by the Great Western Railway. The GWR used it to trial various innovative schemes to reduce the cost of lightly used passenger services, such as the push-pull system, where driver's controls are provided in a trailer coach, enabling the locomotive to propel its train, eliminating the need for the engine to run round at the end of a run, and so cutting costs.

Milk traffic was a considerable source of business on the line.

Read more about this topic:  Wrington Vale Light Railway

Famous quotes containing the words construction and/or traffic:

    “When the leaders choose to make themselves bidders at an auction of popularity, their talents, in the construction of the state, will be of no service. They will become flatterers instead of legislators; the instruments, not the guides, of the people.”
    —Edmund Burke (1729–1797)

    “Cry;—and upon thy so sore loss
    Shall shine the traffic of Jacob’s ladder
    Pitched betwixt Heaven and Charing Cross.”
    —Francis Thompson (1859–1907)