Work Breakdown Structure
A work breakdown structure (WBS), in project management and systems engineering, is a deliverable oriented decomposition of a project into smaller components. It defines and groups a project's discrete work elements in a way that helps organize and define the total work scope of the project.
A work breakdown structure element may be a product, data, a service, or any combination. A WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control.
Read more about Work Breakdown Structure: Overview, History, Example, Misconceptions
Famous quotes containing the words work, breakdown and/or structure:
“It is fair to assume that when women in the past have achieved even a second or third place in the ranks of genius they have shown far more native ability than men have needed to reach the same eminence. Not excused from the more general duties that constitute the cement of society, most women of talent have had but one hand free with which to work out their ideal conceptions.”
—Anna Garlin Spencer (18511931)
“... whats been building since the 1980s is a new kind of social Darwinism that blames poverty and crime and the crisis of our youth on a breakdown of the family. Thats what will last after this flurry on family values.”
—Stephanie Coontz (b. 1944)
“When a house is tottering to its fall,
The strain lies heaviest on the weakest part,
One tiny crack throughout the structure spreads,
And its own weight soon brings it toppling down.”
—Ovid (Publius Ovidius Naso)