Work Breakdown Structure

Work Breakdown Structure

A work breakdown structure (WBS), in project management and systems engineering, is a deliverable oriented decomposition of a project into smaller components. It defines and groups a project's discrete work elements in a way that helps organize and define the total work scope of the project.

A work breakdown structure element may be a product, data, a service, or any combination. A WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control.

Read more about Work Breakdown Structure:  Overview, History, Example, Misconceptions

Famous quotes containing the words work, breakdown and/or structure:

    Policy is the people you work with.
    William Gaskill (b. 1930)

    With the breakdown of the traditional institutions which convey values, more of the burdens and responsibility for transmitting values fall upon parental shoulders, and it is getting harder all the time both to embody the virtues we hope to teach our children and to find for ourselves the ideals and values that will give our own lives purpose and direction.
    Neil Kurshan (20th century)

    Agnosticism is a perfectly respectable and tenable philosophical position; it is not dogmatic and makes no pronouncements about the ultimate truths of the universe. It remains open to evidence and persuasion; lacking faith, it nevertheless does not deride faith. Atheism, on the other hand, is as unyielding and dogmatic about religious belief as true believers are about heathens. It tries to use reason to demolish a structure that is not built upon reason.
    Sydney J. Harris (1917–1986)