Work Breakdown Structure
A work breakdown structure (WBS), in project management and systems engineering, is a deliverable oriented decomposition of a project into smaller components. It defines and groups a project's discrete work elements in a way that helps organize and define the total work scope of the project.
A work breakdown structure element may be a product, data, a service, or any combination. A WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control.
Read more about Work Breakdown Structure: Overview, History, Example, Misconceptions
Famous quotes containing the words work, breakdown and/or structure:
“My lifes work has been accomplished. I did all that I could.”
—Mikhail Gorbachev (b. 1931)
“Where mass opinion dominates the government, there is a morbid derangement of the true functions of power. The derangement brings about the enfeeblement, verging on paralysis, of the capacity to govern. This breakdown in the constitutional order is the cause of the precipitate and catastrophic decline of Western society. It may, if it cannot be arrested and reversed, bring about the fall of the West.”
—Walter Lippmann (18891974)
“Who says that fictions only and false hair
Become a verse? Is there in truth no beauty?
Is all good structure in a winding stair?
May no lines pass, except they do their duty
Not to a true, but painted chair?”
—George Herbert (15931633)