Wilton Power Stations - Wilton 10

Wilton 10

SembCorp announced plans to build the UK's first wood-only burning power station in March 2005. The Wilton 10 Power Station (so called because it was the tenth boiler constructed at the Wilton Power Station) cost £30 million to construct and was built alongside the other Wilton Power Station units. It began generating electricity in September 2007, but was officially opened on 12 November 2007 by Energy Minister Malcolm Wicks. 400 people were employed in the station's construction and there are 15 permanent jobs at the station. The station burns 300,000 tonnes of a combination of sustainable wood, sawmill waste and otherwise unusable wood offcuts a year to produce 30 megawatts (MW) of electricity, as well as 10 MW of thermal energy in the form of steam, which is piped for use in the rest of the Wilton complex. It operates separately from the fossil fuel power station. 80,000 tonnes of waste wood is supplied to the station each year from neighbouring company UK Wood Recycling.

Read more about this topic:  Wilton Power Stations