Cost
The project is estimated to cost 20,000 crore (US$3.4 billion) and will be implemented through a public-private partnership (PPP) mode on Design, Build, Finance, Operate and Transfer (DBFOT) basis by a private entity. The Central Government will provide 20% of the project cost as viability gap funding.
Read more about this topic: Western Railway Elevated Corridor
Famous quotes containing the word cost:
“To call a posit a posit is not to patronize it. A posit can be unavoidable except at the cost of other no less artificial expedients. Everything to which we concede existence is a posit from the standpoint of a description of the theory-building process, and simultaneously real from the standpoint of the theory that is being built.”
—Willard Van Orman Quine (b. 1908)
“Every new stroke of civilization has cost the lives of countless brave men, who have fallen defeated by the dragon, in their efforts to win the apples of the Hesperides, or the fleece of gold. Fallen in their efforts to overcome the old, half sordid savagery of the lower stages of creation, and win the next stage.”
—D.H. (David Herbert)
“Mining today is an affair of mathematics, of finance, of the latest in engineering skill. Cautious men behind polished desks in San Francisco figure out in advance the amount of metal to a cubic yard, the number of yards washed a day, the cost of each operation. They have no need of grubstakes.”
—Merle Colby, U.S. public relief program (1935-1943)