The Western Interconnection is one of the two major alternating current (AC) power grids in North America. The other major wide area synchronous grid is the Eastern Interconnection. The three minor interconnections are the Québec Interconnection, the Texas Interconnection, and the Alaska Interconnection.
All of the electric utilities in the Western Interconnection are electrically tied together during normal system conditions and operate at a synchronized frequency of 60Hz. The Western Interconnection stretches from Western Canada south to Baja California in Mexico, reaching eastward over the Rockies to the Great Plains.
Interconnections can be tied to each other via high-voltage direct current power transmission lines (DC ties), or with variable frequency transformers (VFTs), which permit a controlled flow of energy while also functionally isolating the independent AC frequencies of each side. There are proposals to tie the Western Interconnection to the Eastern Interconnection with four DC ties. It is not tied to the Alaska Interconnection.
On October 13, 2009, the Tres Amigas SuperStation was announced to connect the Eastern, Western and Texas Interconnections via three 5 GW superconductor links.
Famous quotes containing the word western:
“We hold on to hopes for next year every year in western Dakota: hoping that droughts will end; hoping that our crops wont be hailed out in the few rainstorms that come; hoping that it wont be too windy on the day we harvest, blowing away five bushels an acre; hoping ... that if we get a fair crop, well be able to get a fair price for it. Sometimes survival is the only blessing that the terrifying angel of the Plains bestows.”
—Kathleen Norris (b. 1947)