Construction
Located roughly halfway between Timaru and Oamaru, Waimate is the major market and service town for the surrounding district, but when the Main South Line between Christchurch and Dunedin was constructed, it was built some 7 km to the east of the township so that it could follow a direct route along the coastal plain without deviating. Both government and residents agreed that a link from the main line village of Studholme to Waimate was necessary. In 1876, tenders were called for the line and the winning offer, George Pratt's of ₤4,831, was accepted on 10 March 1876. Construction was not difficult and the branch opened on 19 March 1877. The first train was hauled by an A class tank locomotive and had three carriages plus a guard's van.
Two proposals for an extension were made, of which only one eventuated. The plan which did not eventuate was to link Waimate to either Duntroon or Livingstone. One of the proposals for the Otago Central Railway was to build a line from Oamaru to Naseby, and in 1877 an invitation was extended to the Waimate County Council to partake in a plan to connect Waimate to the Oamaru-Naseby line in either Duntroon or Livingstone and thus establish a through route from Central Otago to Canterbury. A deputation representing the advocates of the Oamaru-Naseby line made a presentation before the Waimate County Council on 12 July 1877, but the Council did not view the proposal as desirable. The Oamaru-Naseby proposal itself failed to come to fruition, with Duntroon ultimately served by the Kurow Branch and Livingstone located near the terminus of the Tokarahi Branch.
The other extension proposal was for a line into the hinterland behind Waimate, and this one was successful. Local residents established the Waimate Railway Company in late 1878 to construct an extension from Waimate to the Waihao Valley, and work commenced after W. J. Black's tender for construction of the first section was accepted on 16 April 1882. The initial 11.27 km were built quickly, with the line opened to Waihao Forks on 2 February 1883. Another 2.05 km of trackage to Waihao Downs followed, and this was opened on 24 April 1883, with a small locomotive depot established at the Waihao Downs station. On 1 April 1885, in accordance with the terms of the 1878 District Railways Act under which the Waimate Gorge Branch had been built, the government agreed to take control of the line. There was local pressure to extend the line further and some formation was constructed in 1914 with the goal of continuing the railway to Waihaorunga. However, World War I brought construction to a halt as resources were diverted elsewhere and work did not resume after the war ended. By 1924, the government had decided that extending rural branch lines was not profitable and thus permanently put an end to any plans to build beyond Waihao Downs.
Read more about this topic: Waimate Branch
Famous quotes containing the word construction:
“No construction stiff working overtime takes more stress and straining than we did just to stay high.”
—Gus Van Sant, U.S. screenwriter and director, and Dan Yost. Bob Hughes (Matt Dillon)
“The construction of life is at present in the power of facts far more than convictions.”
—Walter Benjamin (18921940)
“There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.”
—John Dewey (18591952)