USS Von Steuben (SSBN-632) - Construction and Commissioning

Construction and Commissioning

The contract to build Von Steuben was awarded to Newport News Shipbuilding and Dry Dock Company in Newport News, Virginia, on 20 July 1961 and her keel was laid down there on 4 September 1962. She was launched on 18 October 1963, sponsored by Mrs. Fred Korth, and commissioned on 30 September 1964, with Commander John P. Wise in command of the Blue Crew and Commander Jeffrey C. Metzel in command of the Gold Crew.

During the autumn of 1964, the Von Steuben completed two shakedown cruises — one for each crew — and a period of antisubmarine warfare training between the two cruises. On 22 December 1964, her Gold Crew fired her first Polaris ballistic missile on the Atlantic Missile Range before returning to Newport News for Christmas. She changed crews again at the beginning of 1965, and returned to the missile range off Cape Kennedy, Florida, where the Blue Crew fired its first Polaris missile. In February 1965, after completing all initial training operations, she returned to Newport News.

In March 1965, Von Steuben headed for her first duty assignment. She joined Submarine Squadron 18 at Charleston, South Carolina, her new base of operations, and immediately began conducting strategic deterrent patrols.

At the end of her 11th deterrent patrol early in 1968, Von Steuben was reassigned to Submarine Squadron 16 and operated out of Rota, Spain, until the middle of 1969. During that assignment, she visited Groton, Connecticut, in the summer of 1969 for repairs at the Electric Boat Division of General Dynamics Corporation, after which she resumed deterrent patrols out of Rota.

Read more about this topic:  USS Von Steuben (SSBN-632)

Famous quotes containing the word construction:

    The construction of life is at present in the power of facts far more than convictions.
    Walter Benjamin (1892–1940)